Tender Details

TO ENGINEER, PROCURE AND CONSTRUCT A WATER ELECTROLYSIS HYDROGEN GENERATION PLANT, WHICH MUST BE INTEGRATED WITH THE EXISTING RENEWABLE POWER PLANT FOR “GREEN H2 PRODUCTION” AT ERIC ROSHERVILLE FOR A PERIOD OF THREE (3) YEARS CIDB GRADING 7ME/7EP OR HIGHER

Tender Number:

E1256CXMWP_OLD

Client:

ESKOM

Region:

Gauteng

Industry:

Construction

Title:

TO ENGINEER, PROCURE AND CONSTRUCT A WATER ELECTROLYSIS HYDROGEN GENERATION PLANT, WHICH MUST BE INTEGRATED WITH THE EXISTING RENEWABLE POWER PLANT FOR “GREEN H2 PRODUCTION” AT ERIC ROSHERVILLE FOR A PERIOD OF THREE (3) YEARS CIDB GRADING 7ME/7EP OR HIGHER

Closing Date:

27/06/2025 09:59

Site Inspection Date:

28/05/2025 09:59

Tender Description:

Details Tender Number E1256CXMWP Department ESKOM Tender Type Request for Bid(Open-Tender) Province Gauteng Date Published 12 May 2025 Closing Date 27 June 2025 10 00 Place where goods, works or services are required Maxwell Drive-Sunninghill-Johannesburg, Sandton-2000 Special Conditions Venue Eskom Research, Testing and Development, Lower Germiston Road, Johannesburg The meeting arrangement is to meet at the Main Reception at 09 45 Tender acknowledgement form to be submitted to makumej@eskom.co.za containing email address/s to be able to participate in the clarification meeting. ENQUIRIES Contact Person Jeanette Makume Email makumej@eskom.co.za Telephone number 011-800-5642 FAX Number 086-662-6997 BRIEFING SESSION Is there a briefing session? Yes Is it compulsory? No Briefing Date and Time 28 May 2025 10 00 Briefing Venue ERIC Building Rosherville TENDER DOCUMENTS 240-56356396_Earthing and Lightning Protection Standard (Rev 2).pdf 240-53114026_Generation_Project_Engineering_Change_Management_Procedure_(Rev_4).pdf E-Tenderers E-Tendering Training Acknowledgement Form 27 January 2025 (1).docx 240-165573930__Hydrogen_plant_pressure_equipment_preparation_and_pressure_testing.pdf 240-RT&D-783 Tender Returnable Technical Schedule.pdf 240-56355728_Human Machine Interface Design Requirements Standard.pdf 240-56356376 Site Commissioning for Low Pressure Services.pdf 240-56355815 C&I Enclosures & Cable Termination.pdf 240-71432150 Plant Labeling Standard.pdf 240-53114002_Generation_Engineering_Change_Management_Procedure_(Rev_5)_(004).pdf 240-86973501 Engineering drawing std.pdf 240-56364545 Structural Design.pdf 240-56357424 with memo LV protection std.pdf NORTH WEST SUB LV-DB.pdf 240-56360086_NiCad_Standard.pdf E1256CXMWP_Invitation to Tender Hydrogen Facility_12 May 2025.pdf Rosherville Geotech Report.pdf 240-56227516_LV Switchgear and Control Gear Assemblies and Associated Equipment for Voltage up to and including 1000V AC and 1500V DC Standard.pdf Layout.jpg Eskom_-_Standard_Conditions_of_Tender_-_30_January_2025.pdf QS_045 Renewable Hydrogen Facility Typical Activity Schedule March 2025.xlsx 240-145581571_Standard for the Identification of the Contents of Pipelines and vessels.pdf 240-57617975 Low Voltage Motors Procurement.pdf 240-106628253_Standard for Welding Requirements on Eskom Plant.pdf 240-56737654_Inspection Testing and Maintenance of Fire_systems.pdf 240-109253302 _ Quality Control Plan or Inspection Test Plan (QCP or ITP) rev 2.docx 240-53114248 Thyristor and Switch Mode Chargers.pdf 240-53114193_Occuruence and Incident Management proc.pdf MAIN MV RETICULATION SCHEMATIC.pdf 240-105658000 Supplier Quality Management Specification (3).pdf 240-56360034_Stationary_Vented_Lead_Acid_Batteries_Standard.pdf Qualitative Technical Evaluation Criteria for RHF.pdf 240-56536505 HAZLOC std.pdf 20241210_RHF LOSS.xlsx Hydrogen Plant Facility Construction EMP. Signed.pdf 240-53114192 Work Instruction for Control of Nonconformities (Rev 2).pdf 240-56355754_Field Equipment Installation Standard (Rev 3).pdf 240-98784903-Quality_Manual_Final_Rev_5.pdf 20250417_ RT&D Renewable Hydrogen Facility_240-68099512 Form A_Cat 3_ Rev 9.docx 240-49230111 Hazards and Operatbility Analysis.pdf 240_RTD_124_Stakeholder_requirements_defination_for_renewable_hydrogen_Rev_011_(2).pdf 240-51999453 Standard_specification_for_vrla.pdf 240-109253698 CQP Template 2021.docx ANNEX C Designated Material.pdf 240-55410927_Cyber security standard for OT.pdf 240-56355843_Pressure_measurement_systems_installation_standard.pdf ANNEX D Local Content Declaration.pdf Eskom_Supplier_Integrity_Pact_-_02_June_2023.pdf 240-53114190_Internal Audit proc.pdf 240-56355910 Management of Plant Software Standard.pdf 240-56355541_C&I Computer & Equipment Rooms Civil and General Building Requirements Guideline.pdf 240-115583001 LV switchgear Technical schedule A and B.xlsx Annexure A_Technical Specification for Renewable Hydrogen Facility.pdf 240-49230030_Reliability_Engineering_Analysis_Guideline.pdf 240-RT&D-782 Technical Schedule for RHF.xlsx ESKOM RESEACH, TESTING AND DEVELOPMENT- EQUIPMENT LAYOUT NORTH WEST SUBSTATION.pdf 22102024 H2 plant Vendor Document Submittal Schedule .xlsx 240-60782552_Process_Flow_Diagram_Standard_(Rev_1).pdf 240_RTD_126_Concept_Design_Report_Rev_01_(1).pdf 20250417_ RT&D Renewable Hydrogen Facility- RTD_Cat 3_ Rev 7_signed.pdf Annexure B_240-56227413 Hydrogen Systems Standard.pdf 32-373_Information Security IT_OT and Third Party Remote Access Standard.pdf 20250326 SDLI stragety Engineer procure and construct a water electrolysis hydrogen generation plant.docx 240-54937450 Fire Protection and Life Safety Design Standard (Rev 3) (30).pdf 32-520 OHS Risk assessment procedure revision. 5.pdf E-tendering Help Manual for supplier 27 January 2025 (1).docx 240-53113685 Generation Design Review Procedure (Rev 4) (1).pdf 240-56227443_Generation Requirements for Control and Power Cables for Power Stations Standard (Rev 2).pdf 32-95.pdf 240-56241933_Control_of_Welding.pdf 240-56737448_Fire Detection and Life Safety Design Standard.pdf 240-53665024 Engineering Quality Manual (1).pdf Mandatory Technical Evaluation Criteria for RHF.pdf 240-49230046_Failure_Mode_and_Effects_Analysis_Guideline.pdf C1 1 ECC3_ Hydrogen Facility_29042025.doc 240-44682650 Process_Control_Manual_(PCM)_for_Provide_Engineering_during_Project_Sourcing_(Basic).pdf 240-55714363_Generation PS Lighting and Small Power Installation Standard.pdf 240-56355888_Temperature_Measurement_Systems_Installation_Standard_(Rev_3).pdf 240-79669677_DMZ Designs for OT Systems.pdf Research Facility USL V1 2024 FINAL.pdf RTD Renewable Hydrogen Facility Rev1_signed.pdf ANNEX E Supporting Schedul to Annex C.pdf 240-56227589_List of Approved Electronic Devices to be used on Eskom Power Stations Standard.pdf 240-54937439_Fire_Protection_-_Detection_Assessment_Standard_(Rev_4).pdf